Skip to content
Power Tagun Engineering Co., Ltd
EPCC solutions

PTE / EPCC / 02

Primary Distribution Substation System

Primary distribution substations that step 33 kV supply down to 11 kV and feed the medium-voltage networks serving towns, industrial zones, and large developments.

System class33/11 kVEngineering · Procurement · Construction · Commissioning

Defined project scope

One coordinated system, not disconnected packages

Power Tagun coordinates technical decisions, equipment interfaces, site delivery, testing, and handover around the approved system requirement.

01

Load assessment and single-line design

02

Power transformer and 33 kV / 11 kV switchgear specification

03

Feeder protection, control, and metering coordination

04

Installation, testing, and energisation support

Typical equipment

Integrated around the single-line design

  • 0133 kV incoming switchgear
  • 0233/11 kV power transformers
  • 0311 kV outgoing feeder switchgear
  • 04Protection, control, and metering panels

Project outcomes

01

Coordinated 33 kV and 11 kV interfaces

02

Selective feeder protection

03

Dependable medium-voltage distribution

Delivery pathway

Controlled from engineering intent to energisation

  1. 01

    Engineering

    Define the system, studies, interfaces, and approved design basis.

  2. 02

    Procurement

    Match equipment, documentation, and delivery to the approved specification.

  3. 03

    Installation

    Coordinate site interfaces, installation quality, and construction readiness.

  4. 04

    Testing

    Verify protection, control, equipment, and system performance before energisation.

  5. 05

    Commissioning

    Control handover, energisation, and project records.

Related systems

Compare another EPCC solution

View all solutions

Discuss a 33/11 kV system with our engineering team.