PTE / EPCC / 03
Secondary Distribution Substation System (Industrial)
Secondary distribution substations that step 33 kV supply directly down to 400 V for factories, industrial plants, and large project sites.
Defined project scope
One coordinated system, not disconnected packages
Power Tagun coordinates technical decisions, equipment interfaces, site delivery, testing, and handover around the approved system requirement.
Load assessment and equipment sizing
Transformer and LV board integration
Protection selectivity and cable coordination
Site delivery and commissioning pathway
Typical equipment
Integrated around the single-line design
- 0133 kV switchgear
- 02Distribution transformers
- 03Main LV switchboards
- 04Metering and protection systems
Project outcomes
Specification-matched equipment
Reduced interface risk
Dependable industrial distribution
Delivery pathway
Controlled from engineering intent to energisation
- 01
Engineering
Define the system, studies, interfaces, and approved design basis.
- 02
Procurement
Match equipment, documentation, and delivery to the approved specification.
- 03
Installation
Coordinate site interfaces, installation quality, and construction readiness.
- 04
Testing
Verify protection, control, equipment, and system performance before energisation.
- 05
Commissioning
Control handover, energisation, and project records.